Articles
Surviving the NOC at CLUS17
June 20th 2017. Months of preparation had lead to this day. Trucks rolled in at 8 am and began unloading all of our gear, an entire 18 wheelers worth. Things were looking good. By 9 am we had our racks offloaded and ready to be installed. What could go wrong right? Unfortunately for us, one of the m…
Staging and Setup for Cisco Live 17
The average IT refresh cycle for access layer switches is typically anywhere between 5 to 8 years. This means the typical engineer configures a switch once, and then, other than minor changes, doesn’t have to reconfigure that switch again for a long time. The rollout process also tends to be s…
6